Toshiba CTX28 Telephone User Manual


 
Rack Mount Cabinets
Inspection
5-2 Strata CTX I&M 06/04
Inspection
When the system is received, examine all packages carefully and note any visible damage. If any
damage is found, do not open the packages. Contact the delivery carrier immediately and make the
proper claims.
After unpacking (and before installing), check the system against the packing list and inspect all
equipment for damage. If equipment is missing or damaged, contact your supplier immediately.
Be sure to retain original packaging materials for re-use when storing or transporting system
hardware.
Site Requirements
Space
Do not install other devices between cabinets.
No gap should exist between the cabinets. This provides EMC by connecting 2 screws between
cabinets.
The 3.28 ft. (1m) of space is necessary for the front and back of the rack to make installation
and repair easy. Installation and wiring are done from the front and rear of the cabinets.
A space measuring 1.75 inches (44.5mm) must always be left above the top of the rack
mounted cabinet for the purpose of ventilation. It is also necessary to have a space between the
top/bottom cabinet and any other device (shown below).
Figure 5-1 Required Space
Ventilation
50% or more of the front and back of the cabinet must be left open for ventilation.
Cabinet rack must always be left open for ventilation.
CRSUE672A
CRSUB672
A
10.5 inches
(267 mm)
1.75 inches
(
44.5mm
)
Other Device
Front View
CRSUE672A
Other Device
3.28'
3.28'
Side View
Wall