Toshiba CTX28 Telephone User Manual


 
Strata CTX670 Installation
Install Reserve Power
4-36 Strata CTX I&M 06/04
Figure 4-20 Floor Mounting Cabinet Installation
Bolt Cabinets to Concrete Floor
1. Mount the CTX670 Base Cabinet on Floor
Mount Fixtures (see Figures 4-19 and
4-21). Position the Base Cabinet at the
selected installation location.
2. Mark the floor where holes will be drilled.
Move the Base Cabinet prior to drilling.
Note Cover the Base Cabinet with a drop
cloth to protect the power equipment
from dust created during drilling.
3. Use a hammer drill to make holes for 3/8-
inch bolt anchors.
4. Install the bolt anchors, with plugs, in the
drilled holes.
5. Using the driving tool and a hammer,
drive each bolt anchor into the floor.
6. Move the Base Cabinet into position on
the equipment room floor.
7. Secure the Base Cabinet to the floor using bolts, lock washers, and flat washers.
Note RWBF (3-pairs) and BFIF Stands (1-pair) are supplied with floor installation kit BFIF.
BFIF
BFIF
BFIF
RWBFs are used on left and
right sides, wherever indicated
BFIFs are used on left and
right sides, wherever indicated
“A”
Front two
screws, left
and right sides
“B”
Back two
screws, left
and right sides
AB
AB
AB
A
A
AB
AB
AB
AB
RWBF
RWBF
RWBF
RWBF
B
B
RWBF
RWBF
RWBF
BFIF BFIF
AB
AB
AB
AB
AB
RWBF
RWBF
RWBF
AB
AB
AB
AB
AB
AB
RWBF
RWBF
RWBF
RWBF
5007
Concrete
Floor
BFIF
(Floor
mount
fixture)
Bottom
Cabinet
Bolt
Lockwasher
Bolt Anchor
Plug
5242
Figure 4-21 Installation on Concrete Floor