Nortel Networks BCM200/400 Telephone User Manual


 
Chapter 12 Install Companion or DECT Systems 275
Installation and Maintenance Guide
4 Route and connect the coaxial cable from the surge protector to the appropriate base station
BNC connector.
5 This procedure is complete.
Install DECT Systems
The DECT system requires a DECT media bay module to allow communication between the
DECT handsets and the Business Communications Manager. The module installs in the Business
Communications Manager base unit or expansion unit. A maximum of eight base stations, which
are distributed throughout the transmission area, are connected to the module. After this step is
complete, the handsets are subscribed to the Business Communications Manager system.
For detailed installation refer to the Business Communications Manager 3.0 DECT Installation
and Maintenance Guide.
Each jack on the DECT module corresponds to an internal port on the DECT module. These
numbers are used to access the base stations when you disable them to turn mobile recording on
when you subscribe new handsets,.
Note: The total length of the coaxial cables from the outdoor antenna to the base station
must not exceed 10 m (33 ft.).
Warning: Plug each base station in sequentially. Ensure that each base station starts to
perform the startup sequence before plugging in the next base station. You can check base
station states through the DECT module interface.
Warning: For detailed information, refer to the DECT Installation and Maintenance
Guide. Figure 177 demonstrates these connections.