Nortel Networks BCM200/400 Telephone User Manual


 
112 Chapter 4 Install, remove or replace the Media Bay Modules
P0993133 03
Reconnect the equipment
After you install the module correctly into the bay, you must return the equipment to operation in
an orderly manner.
Follow these steps carefully to ensure that you return your system to operation without
endangering the equipment or yourself.
1 Plug the power cords for the Business Communications Manager and the expansion unit, if
there is one, back into the ac outlets.
2 Connect the cables to the proper outlets on the media bay modules and the MSC on the server.
3 Check that the LEDs on the modules are on and indicating the correct state. Refer to “Check
system power and status” on page 129 for a detailed description of the LED states.
4 Test existing functions to confirm their operation.
5 Configure the module. Refer to the Business Communications Manager Programming
Operations Guide for details.
6 This procedure is complete.
Remove a media bay module
Use the procedures is this section to remove one or more media bay modules from a Business
Communications Manager platform base chassis or expansion unit.
Figure 62 provides an overview of the process for removing media bay modules
Note: The Business Communications Manager system starts up when you connect the ac
power cord. System startup takes several minutes to complete.
Caution: DECT modules
Plug the base station RJ45 cables into the DECT module one at a time. Ensure each base
station begins the startup sequence before plugging in the next module.