Installation and Maintenance Guide
Chapter 4
Install, remove or replace the Media Bay Modules
Use the procedure in this chapter to install, remove or replace the media bay modules in the
Business Communications Manager platform base chassis and the expansion unit.
Install a Media Bay Module
After you set the switches on the media bay modules, you can install them in the Business
Communications Manager or the expansion unit.
The BCM200 platform accommodates a maximum of two media bay modules. The BCM400
platform accomodates a maximum of four media bay modules. If your BCM400 system requires
more than four media bay modules, you need to connect a Business Communications Manager
expansion unit to the Business Communications Manager.
Figure 61 provides an overview of the process for installing media bay modules.
Figure 61 Overview of installing a media bay module
Note: The number of media bay modules you can add varies, depending on the
DS30 resources that are available. Refer to Figure 195 on page 320.
no
yes
Set module
DIP
switches
Disconnect cables
from the front of the
server and expansion
unit
Disconnect power from
both units
Remove front bezel
from the expansion
unit to eject blank
filler or MBM
Replace bezel
Restore power to
Business
Communications
Manager and
expansion unit
Reconnect all cables
Use the Unified Manager
to identify the module to
the system
Monitor LEDs for
power and status.
Install new module
Continue with system
initialization
Is this installation
part of a new
system installation?