Index
Central office trunks 4-2
protection 2-14
Channel service unit (CSU) 4-17
551 T1 4-17 4-33
mounting 4-36
connection to the 100D
module 4-41
ESF T1 4-17
connecting 4-26
DIP switches 4-18
front panel LEDs 4-31
installing 4-17
power option switch, setting
Up 4-24
Connecting block, removing
damaged 3-72
Control unit
backboard 2-5
connecting to AC outlet 2-62
connecting to network
interface 4-1
connecting a CAT 5-7
connecting a PC 5-2
connecting a printer 5-8
dimensions 2-4
environmental requirements 2-3
grounding 2-11
housing, installing 7-32
housing, removing 2-22
installing 1-4
location 2-4, 2-5
requirements 2-4
upgrading 2-22
CONVERSANT Intro 8-14
Convert 7-4, 7-7
Copper shield 2-37
Coverage, testing 7-24
Credit card verification
terminals 3-17
D
Data equipment, connecting 6-1
Data hunt group 6-24
Data module option settings
analog-to-digital 6-32
digital-to-analog 6-29
Data stations 6-1
equipment configurations 6-4
connecting 1-5
synchronous high-speed
digital 6-18
Date 7-9
Delay, calling group
announcements 3-18
Dial dictation 3-17
Dictation system access,
testing 7-27
DID trunks, testing 7-16
Digital data and digital voice
equipment configuration 6-13
Digital data-only equipment
configuration 6-16
Digital data stations 6-3
Digital to analog conversion 6-23
DIP switches 2-54, 4-18, 4-34, 5-21
Direct Station Selector (DSS)
installing 3-31
testing 7-26
Dry loop (DL) 4-24
DTE 15-pin connector pin
assignments 4-29
IN-2
Index