AT&T Release 2.0 Telephone User Manual


 
Connecting the Control Unit to the Network Interface
Set the Artificial Transmit Line Option
Open the top panel of the ESF T1 CSU and set the Line Build-Out (LBO)
switch to the proper option, which depends on the distance from the CSU to
the first line repeater (see Table 4-14).
Table 4-13. Artificial Transmit Line Options
Position Distance
Option
1
0.0 dB
0 - 1000ft
2
7.5 dB
1000 - 2000ft
3
15.0 dB 2000 — 3000 ft
NOTE:
The required setting for the LBO switch is usually specified by the
telephone company.
The receive path contains a fixed 7.5 dB artificial line and an
automatic line build-out (ALBO); circuit, which automatically
compensate for signal levels in the range of 0 to -27.7 dB.
Step 2: Mounting the CSU
When you are finished setting the CSU switches, mount the CSU in a relay
rack or on a shelf as a standalone unit.
Installing the Channel Service Unit
4-25