Connecting the Control Unit to the Network Interface
Building the Wiring Field
Build the wiring field between the network interface and the control unit by
using 110AB1-100JP12 terminal blocks with modular jacks and associated
hardware.
RJ21X Wiring Field Hardware
■ 10AB1-100JP12 termination blocks with modular jacks
■ 110A1 wire troughs
■ D-rings
■ D2R cords
See Figure 4-2.
4-6
Wiring