Page 134 of 466 Installing software on the CS 1000E
NN43041-310 Standard 01.11 October 2008
Verifying CP PM Call Server 0 is active
Use the following commands to verify that CP PM Call Server 0 is active.
Make the system redundant
At this point, Core/Net 0 is ready to be synchronized with Core/Net 1.
Procedure 23
Making the system redundant
1 Check to see if the ELAN and TLAN cables are attached. If not, attach the
ELAN and TLAN cables to the CP PM faceplate connectors both CP PM
cards.
2 Once the synchronization of memories and drives is complete, STAT the
CPU and verify that the CPUs are in a true redundant state.
LD 135 Load program
STAT CPU Get the status of the CPUs
CFN
LD 135
STAT CPU Get status of CPU and memory
**** Exit the program