Installing and connecting CS 1000E hardware Page 107 of 466
Communication Server 1000E Installation and Commissioning
Figure 23
2-port SDI cable (NTAK19EC) cable
End of Procedure
Cabling the cards
The following sections describe the process required to cable the MGC and
CP PM cards.
Cabling the MGC
The existing 3-port SDI cable (NTBK48AA) is reused. It connects to the SDI
port on the Chassis. Figure 24 on page 109 shows front of MGC. The CE and
CT ports are reserved for the CP PM card only. The CE connects to the ELAN