Nortel Networks M3110 Telephone User Manual


 
Page 11 of 504
Telephones and Consoles Description, Installation, and Operation
18
List of procedures
Procedure 1
Connecting the BLF/CGM to the
M2250 attendant console . . . . . . . . . . . . . . . . . . . . . . . .35
Procedure 2
Checking the functionality of the
Busy Lamp Field/Console Graphics Module . . . . . . . .42
Procedure 3
Removing the Busy Lamp
Field/Console Graphics Module . . . . . . . . . . . . . . . . . . .43
Procedure 4
Installing an Attendant Supervisory Module
on an M2250 attendant console . . . . . . . . . . . . . . . . . . .45
Procedure 5
Installing wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57
Procedure 6
Installing the M2250 attendant console . . . . . . . . . . . .60
Procedure 7
Removing the M2250 attendant console . . . . . . . . . . . .61
Procedure 8
Removing the M2250 attendant console top cover . . . 62
Procedure 9
Installing the M2250 attendant console top cover . . . .63