Reconnecting the equipment
After you install the module correctly into the bay, you must return the equipment to operation in
an orderly way.
Follow these steps carefully to ensure that you return your system to operation without
endangering the equipment or yourself.
1 Plug the power cords for the BCM1000 and the BCM1000e, if there is one, back into the ac
outlets.
2 Connect the cables to the proper outlets on the media bay modules and the MSC on the server.
3 Check that the LEDs on the modules are on and static. Refer to “Checking system power and
status” on page 141 for a detailed description of the LED states.
4 Test existing functions to confirm their operation.
5 Configure the module. Refer to the Business Communications Manager Programming
Operations Guide for details.
Note: The Business Communications Manager system starts up when you connect the ac
power cord. System startup takes several minutes to complete.
Caution: DECT modules
If you have a DECT module on your system: Plug the base station RJ45 cables into the
DECT module one at a time. Ensure each base station begins the startup sequence before
plugging in the next module.