Lucent Technologies Release 3 Telephone User Manual


 
Conversion Instructions
Issue 1 June 2000
2-3
Task 1 - Inventory Materials
Verify that you have the following materials and information before starting the
conversion:
Conversion checklist from Chapter 1, Conversion Checklist, page 1-2
Login password for craft
Remote maintenance center contact
The document INTUITY Integration with MERLIN LEGEND
Communications System, 585-310-255, Issue 1
The completed worksheets from Chapter 2, Planning the Integration, in
INTUITY Integration with MERLIN LEGEND Communications System, 585-
310-255, Issue 1
!
CAUTION:
Without the information from the worksheets, you will not be able to
complete the installation.
Switch integration software for MERLIN LEGEND integrations:
The MERLIN LEGEND switch integration floppies
(J1P321TC1 L-27) (2-disks)
The SPM floppies (J1P321TC1 L-26)
Blank tape(s) for back-up
NOTE:
Do not use a tape size smaller than 525 Mbytes with the
INTUITY system. Tapes smaller than 525 Mbytes cause the
backup to fail. If the system has a 2-Gbyte tape drive, use
either a 525 (406168526) or a 2-Gbyte (407333582) tape.
Hardware: Any cables necessary to connect the Lucent INTUITY system
to the MERLIN LEGEND Communications system.
Task 2 - Deactivate Alarm Origination
This procedure deactivates alarm origination so that the Lucent INTUITY system
will not inform the remote maintenance center of any alarms that occur during the
update process.
NOTE:
If the system does not have alarm origination, continue with Task 3, Stop
the Voice System, page 2-5.
To deactivate alarm origination: