NEC ND-70919 IP Phone User Manual


 
CHAPTER 2 INSTALLATION
Installation Procedure for Event Based CCIS
NEAX2000 IVS
2
ISDN System Manual
ND-70919 (E), Issue 1.0
Page 61
INSTALLATION PROCEDURE FOR EVENT BASED CCIS
Install the equipment for Event Based CCIS according to the procedure shown in Figure 2-16.
NOTE: For Call Recording of ISDN call, install the equipment for SMDR/CIS. For details, refer
to the Installation Procedure Manual.
Figure 2-16 Installation Procedure for Event Based CCIS
END
START
Mounting
PRT Card or BRT Card
DTI/PRT/BRT Card Cable
Connection via MDF
Selection of PLO in
MP Card
DTI and DCH Card/
Mounting CCH Card
DTI/DCH/PRT See Page 42.
BRT See Page 50.
See CHAPTER 4.
See Page 62.
or via CONN Card
DTI/PRT See Page 44.
CONN See Page 47.
BRT See Page 51.