AT&T 2400 Cordless Telephone User Manual


 
Issue 2 December 1995 8-1
8
Switch Integration Device
Administration
The instructions in this chapter explain how to configure the SID to integrate with
an NEAX 2400 MCI switch and an INTUITY System. The installation technician
administers the SID based on NEAX switch administration information provided
by the customer. As you administer the SID configuration, you must perform the
following tasks:
Administer the basic parameters
Number of voice mail ports
Message desk number
CPID pad string
MWI pad string
MWI feature
Administer the extensions and logical terminal numbers
Save and start the configuration
Administer the serial data links
Set the security level
Change the system parameters
Set the date and time
Adjust the LCD contrast