AT&T 2400 Cordless Telephone User Manual


 
Issue 2 December 1995 xiii
About This Document
Chapter 4, "Hardware Installation", describes the installation of the SID,
cables to the switch, and cables to the INTUITY system. This chapter only
contains information for installing the hardware components required for
the integration.
Chapter 5, "Installing SID Software on the INTUITY System", contains
instructions for installing the INTUITY system software required to
integrate with the NEAX 2400 switch.
Chapter 6, "Administering the INTUITY System for the NEAX Integration",
contains instructions for administering an INTUITY system to integrate with
the switch. The chapter includes instructions for setting the message
waiting lamp parameters, setting the switch interface parameters, and
associating the application and the switch interface.
Chapter 7, "NEAX 2400 Switch Administration", contains information and
instructions for administering a NEAX 2400 MCI switch to work with an
INTUITY system.
Chapter 8, "Switch Integration Device Administration", contains information
and instructions for administering the SID to work with the INTUITY
system.
Chapter 9, "Acceptance Tests", provides instructions for the switch
administration you must perform before you can continue with the
acceptance tests.
Chapter 10, "Cut-to-Service", provides instructions for the switch
administration you must perform before you can continue with
cut-to-service.
Appendix A, "Troubleshooting and Error Logs", provides troubleshooting
information to help you isolate and correct integration problems.
Appendix B, "Using Views During Integration", provides information about
the SID real-time views of the integration process.
Appendix C, "Switch Administration for INTUITY Lodging", provides switch
administration procedures if you have INTUITY Lodging.
The document also includes a list of common abbreviations, a glossary, and an
index.