NEC ND-71762(E) Telephone User Manual


 
ND-71762 (E) CHAPTER 5
Page 49
Issue 2
INSTALLATION TEST PROCEDURE
CHAPTER 5 INSTALLATION TEST PROCEDURE
1. GENERAL
This chapter describes the installation tests that are performed after system start up and after the office data has been
assigned. The following test procedure are covered.
Overall Test for CCIS Line
CCIS Service Feature Functional Test
2. INSTALLATION TEST PROCEDURE
2.1 Overall Test for CCIS Line
Tests are to be performed to check CCIS Lines by connecting them to a trunk on an individual basis.
The speech path conditions (speech level, presence of noise, one-way speech, no speech, etc.) over the connection
to the distant office will be checked. Release of the trunk used will also be checked.
Overall Test Procedure
START
Overall Test of CCIS Tie Line Outgoing Call: Paragraph 2.1.1
Overall Test of CCIS Tie Line Incoming Call: Paragraph 2.1.2
Test of Connection and Alternate Routing to All Tie Lines: Paragraph 2.1.3
Test of Tandem Connection to Tie Line: Paragraph 2.1.4
PAD Setting: Paragraph 2.1.5
END