Chapter 3 Installing WLSE 1130-19 Hardware
Installing the WLSE 1130-19 in a Rack
3-14
Installation and Configuration Guide for the CiscoWorks Wireless LAN Solution Engine
78-16345-01
g. See Figure 3-12. Push the server to the closed position. If the cable is too
heavy to carry the server, use a screwdriver to adjust the cam so that the cable
management arm is horizontal.
Figure 3-12 Fastening the Server into the Rack
Warning
This product relies on the building’s installation for short-circuit (overcurrent)
protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15A
(U.S./CAN); 240 VAC, 10A (INTERNATIONAL).
Statement 1005