Panasonic KX-TD816 Telephone User Manual


 
5.2 Wireless System Installation
174 DECT Installation
After the Site Survey
After obtaining the proper measurement results, the following procedures are required before
mounting the Cell Station to the wall.
1. Disconnect the AC adaptor.
2. Switch the Radio Signal Test Switch of the Cell Station from ON to OFF.
3. Connect the cable from the Cell Station Interface Unit the Cell Station, and pass the cord
through the groove on the unit.
10
10
10
10
10
10
ON
123456
OFF
Radio Signal Test Switch