Installing and administering the patch cord/jumper
Issue 3 January 2008 67
Connecting trunk pairs to media gateway
using jumper wires to establish 3-pair modularity
Figure 32: 3-pair modularity for trunk pairs for 1-pair trunks on page 67 and Figure 33: 3-pair
modularity for trunk pairs for 3-pair Tie trunks on page 68 show trunk pairs connected to the
media gateway with jumper wires to establish 3-pair modularity.
To connect the trunk pairs to the purple field:
1. Connect B25A cables between the network interface and the sneak fuse panels. See
Figure 32: 3-pair modularity for trunk pairs for 1-pair trunks
on page 67.
2. Connect A25D/B25A cables from the sneak fuse panels to the 110-type terminal block-type
connecting block connectors in the green field.
3. Connect 1-pair patch cords/jumper wires from each 110-type terminal block row in the green
field to the 110-type terminal block rows in the purple field for 1-pair central office (CO)
trunks or in Figure 33: 3-pair modularity for trunk pairs for 3-pair Tie trunks
on page 68 for
3-pair tie trunks.
Figure 32: 3-pair modularity for trunk pairs for 1-pair trunks
Figure notes:
1. Green Field
2. 1-Pair Jumpers
3. Pairs
4. Purple Field
12345678
1 4 71013161922
1 4 71013161922
1 4 71013161922
910111213141516 1718192021222324
r7
58
42
5b
MMR
03
14
96