Safety Recommendations for Rack Installations
Ensure proper installation of the unit in a closed or multi-unit enclosure by
following the recommended installation as defined by the enclosure
manufacturer. Do not place the unit directly on top of other equipment or place
other equipment directly on top of the unit. If installing the unit in a closed or
multi-unit enclosure, ensure adequate airflow within the rack so that the
maximum recommended ambient temperature is not exceeded. Ensure that the
unit is properly connected to earth ground by verifying that it is reliably
grounded when mounted within a rack. If a power strip is used, ensure that the
power strip provides adequate grounding of the attached apparatus.
When mounting the equipment in the rack, make sure mechanical loading is
even to avoid a hazardous condition, such as loading heavy equipment in rack
unevenly. The rack used should safely support the combined weight of all the
equipment it supports.
Ensure that the mains supply circuit is capable of handling the load of the
equipment. See the power label on the equipment for load requirements (full
specifications for MultiVOIP models are presented in chapter 1 of this
manual).
Maximum ambient temperature for the unit is 40 degrees Celsius (104 degrees
Fahrenheit). This equipment should only be installed by properly qualified
service personnel. Only connect like circuits. In other words, connect SELV
(Secondary Extra Low Voltage) circuits to SELV circuits and TN
(Telecommunications Network) circuits to TN circuits.