Giant 1-Feb Pager User Manual


 
CHAPTER
Installing and Starting Up the Hub 2-1
2
Installing and Starting Up
the Hub
This chapter provides installation warnings, guidelines, requirements, and package
contents and the following procedures:
Unpacking the hub
Powering up the hub and running the power-on self-test (POST)
Installing the hub on a tabletop or shelf, in a standard or telco rack, and on a wall
Connecting to the console port (FastHub 400M models)
Assigning IP information to the hub and displaying the web and menu consoles
(FastHub 400M models)
Connecting to the 10/100 ports on the hub
Accessing the management interfaces (FastHub 400M models)
Going to related procedures