NEC 120 Answering Machine User Manual


 
AD-25182501 CHAPTER 3
Page 35
Revision 1.0.1
NAP- 200-003
Sheet 17/29
Installation of Main Equipment
Figure 003-18 Modular Layout for 8 PIM Configuration
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF2
or
TPF2
100
Pair
(L)
Notes: - MDF cable lengths: PIM's 0 to 3 = 1.5 m
PIM's 4 to 6 = 2.5 m
- PIM 6 - LTC 0-1 connect to (R) Krone (MDF 2)
- LTC 2 connect to (L) Krone (MDF 3).
- 240V connect to 4 way powerboard.
- BATTM0 and/or BATTM1 can be supplied 
for external battery backup either as MIN. 
or MED. backup configuration.
- If BATTM0 or BATTM1 is not required use
dummy module (1 ONLY).
- If a 78 A-H Battery is requried, add one more 
BATTM (one shelf for PIM's 0 to 3 and the 
other for PIM's 4 to 6).
-
+
-
+
-
+
PS12260
-
+
BATTM1
TO
PIM4 PWR
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF0
or
TPF0
PIM1
PWR SUPPLY
100
Pair
(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)
PIM2
LTC1
LTC2
PWR SUPPLY
MDF0(R)
MDF0(R)
MDF1(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF1
or
TPF1
100
Pair
(L)
LTC0
LTC1
LTC2
MDFO(L)
MDF0(R)
MDFO(R)
PIM3
LTC1
LTC2
PWR SUPPLY
MDF1(L)
MDF1(L)
MDF1(L)
LTC0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
LTC0
PWR SUPPLY
LTC0
LTC1
LTC2
MDF0(L)
MDF0(L)
MDF0(L)
+
-
PIM0
PS12260
SHELF 1
MIN. BACKUP,
26 A-H
SHELF 2
MED. BACKUP
(SHELF 1+2),
52 A-H
BATTM0
TO
PIM0 PWR
PWR SUPPLY
LTC0
LTC1
LTC2
MDF2(L)
MDF2(L)
MDF2(L)
+
-
PIM4
240V AC
PWR SUPPLY
LTC0
LTC1
LTC2
MDF2(L)
MDF2(R)
MDF2(R)
PIM5
240V AC
PWR SUPPLY
LTC0
LTC1
LTC2
MDF2(R)
MDF2(R)
MDF3(L)
PIM6
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF3
or
TPF3
100
Pair
(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)