NEC 120 Answering Machine User Manual


 
AD-25182501 CHAPTER 3
Page 33
Revision 1.0.1
NAP- 200-003
Sheet 15/29
Installation of Main Equipment
Figure 003-16 Modular Layout for 6 PIM Configuration
Notes: - MDF cable lengths:
PIM's 0 to 3 = 1.5 m
PIM 4 = 2.5 m
- PIM 4 - LTC 0-2 connect to (L) Krone (MDF 2).
- 240V connects as shown.
- BATTM0 and/or BATTM1 can be supplied for 
external battery backup either as MIN. or MED.
backup configuration.
- If BATTM0 or BATTM1 is not required use
dummy module (1 ONLY).
- If 78 A-H Battery is requried, add only one 
more BATTM (for PIM's 0 to 3).
-
+
-
+
-
+
PS12260
-
+
BATTM1
TO
PIM4 PWR
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF0
or
TPF0
PIM1
PWR SUPPLY
100
Pair
(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)
PIM2
LTC1
LTC2
PWR SUPPLY
MDF0(R)
MDF0(R)
MDF1(L)
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF1
or
TPF1
100
Pair
(L)
LTC0
LTC1
LTC2
MDFO(L)
MDF0(R)
MDFO(R)
PIM3
LTC1
LTC2
PWR SUPPLY
MDF1(L)
MDF1(L)
MDF1(L)
LTC0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
LTC0
PWR SUPPLY
LTC0
LTC1
LTC2
MDF0(L)
MDF0(L)
MDF0(L)
+
-
240V AC
PIM0
PS12260
SHELF 1
MIN. BACKUP,
26 A-H
SHELF 2
MED. BACKUP
(SHELF 1+2),
52 A-H
BATTM0
TO
PIM0 PWR
PWR SUPPLY
LTC0
LTC1
LTC2
MDF2(L)
MDF2(L)
MDF2(L)
+
-
PIM4
240V AC
240V AC
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF2
or
TPF2
100
Pair
(L)