3. INSTALLATION
BAS-300G, BAS-311G, BAS-326G
5
3-2. Installing the control box
Remove the eight screws (1), and then
remove the control box cover (2).
(3) Control box
(4) Bolts [4 pcs.]
(5) Plain washers [4 pcs.]
(6) Spring washers [4 pcs.]
(7) Nuts [8 pcs.]
(8) Power switch
(9) Wood screws [2 pcs.]
(10) Staples [4 pcs.]
3-3. Installing the oil pan
For motor-driven work clamp
specifications, install the treadle unit
mounting bolt (A) before installing the
oil pan.
(Refer to "3-7. Installing the treadle unit
(motor-driven work clamp
specifications)".)
(1) Oil pan
(2) Nails [7 pcs.]
(3) Rubber cushions [4 pcs.]
(4) Waste oil tank
4911Q
1841B
Operator
1840B