Polycom 1725-36122-001 Cordless Telephone User Manual


 
SpectraLink 6300 MCU: Facility Preparation
PN: 1725-36122-001_M.doc
52
5. Screw the protective cover onto the Base Station enclosure.
Power Up and Check Diagnostics
Turn the power switch in the upper left of the Primary and Expansion
Shelves on.
After a slight delay, the lights on the cards will cycle through
diagnostic tests.
After testing completes, lamp 1 should flash green, indicating that the
card is running. If the Alarm light is red, there is a problem with the
system. Refer to SpectraLink 6300 MCU: Maintenance and Diagnostics
for troubleshooting information.