2.9 Connection of 2.4 GHz Portable Stations
Installation Manual 175
2.9.2 Procedure Overview
When connecting the wireless system, use extreme care to conduct a site survey. Inadvertent site survey
can result in poor service area, frequent noise, and disconnection of calls.
1. Investigate the installation site
Refer to "2.9.3 Site Planning".
a. Obtain the map of the CS installation site.
b. Consider the service area demanded by the user on the map.
c. Plan the locations of each CS, taking account of distance, building materials and etc.
2. Prepare the CS for site survey
Refer to "2.9.4 Before Site Survey".
a. Assign a CS number to each CS by setting the DIP switches on the back of the CS.
b. Supply electricity to each CS using an AC adaptor or a battery box.
c. Install each CS temporarily as planned.
Notes
• Install at least 2 m above the floor.
• Keep the antennas in the upright position.
3. Conduct the site survey
Refer to "2.9.5 Site Survey".
a. Test the radio signal strength using the PS.
Confirm that the radio signal strength level is "12" near the CS.
Using the KX-TD7680
Using the KX-TD7690
b. By walking away from the CS with the PS, check the radio signal strength. The radio signal strength
weakens as you walk away from the CS.
c. Map the CS coverage area at radio signal strength levels "3" and "8".
d. Make sure that adjacent CS coverage areas overlap where the radio signal strength level is "8" by
at least 5 m.
e. Make sure that the radio signal strength level is greater than "3" at any location within the service
area demanded by the user.
Display example:
Press 1, 9, and POWER
for more than 2 seconds.
<< SEARCHING >>
CS NO.1 LEVEL:12
SAVE:0123456789
1 to 9
CS No.
1
9
0
Display example:
Press 1, 9, and POWER
for more than 2 seconds.
<< SEARCHING >>
CS NO.1 LEVEL:12
SAVE:0123456789
1 to 9
CS No.
1
9
9