Sprint Nextel SP-809 Answering Machine User Manual


 
14
Preparation
CHARGING A SPARE BATTERY PACK
You can also charge and store a spare battery pack in the base.
The spare battery pack fully charges in 15 hours.
1
Press the tab on the
spare battery pack compart-
ment and lift off the cover.
2
Place the battery pack in
the compartment as indicated
by the polarity symbols (+ and
–) marked inside. The SPARE
BATT/CHARGING indicator
on the base lights.
3
Replace the cover.
n
Preparation
SETTING THE DIALING MODE
Set the dialing mode for the type of service you have. If you are not
sure which type you have, once the handset’s battery pack is fully
charged, do this test.
1
Lift the handset, then
press
PHONE
and listen for
the dial tone.
2
Press any number other than
0
.
Note:
If your phone system requires that you dial an access
code (9, for example) before you dial an outside number, do not
press the access code either.
Tab
SPARE BATT/
CHARGING
Indicator
PHONE
43-5809.fm Page 14 Wednesday, August 18, 1999 1:43 PM