SpectraLink Corporation Link WTS Installation and Operation
Part Number: 72-0075-01-C-W.doc Page 24
Mount Base Stations On Finished Ceilings
If your site does not have a dropped tile ceiling, the Base Station can be mounted to a
finished ceiling or wall with a 4-5" long 1/4" –20 TPI plastic or nylon screw or bolt (such
as a lag screw).
!!
The customer's wire contractor is responsible for this installation.
1. Drill two holes approximately one inch apart. Make the holes large enough to
accommodate the RJ-45 connector and a bolt to secure the Base Station.
2. Insert a wide washer above the ceiling, then screw the bolt into the beam or
ceiling.
3. Insert three nuts on the bolt, then screw the Base Station into the bolt, being
careful not to insert the bolt more than 1/3 inch, five full turns, into the
Base Station.
If the ceiling is open with I-beams or pipe construction, mount the Base Station with I-
beam clamps or pipe clamps.