SpectraLink Corporation Link WTS Installation and Operation
Part Number: 72-0075-01-C-W.doc Page 2
This table lists the installation steps and the person usually responsible for each step.
üü
Task
Description
Wire
Contractor
Installer
System
Admin
Site Preparation
Determine Location of MCU
ü
Run Cable for System
Run Cable to Base Station Locations
ü
Pull Cable
ü
Terminate Cable at Base Station Locations
ü
Prepare and Install Demarc Blocks
ü
Assign and Program Ports
ü
Connect Cables to Demarc Blocks
ü
Install SpectraLink System
Survey Site and Check Components
ü
Install MCUs
ü
Install Base Stations
ü
Install Outdoor Base Stations
ü
Connect and Register Wireless
Telephones
ü
Set Up Diagnostic Modem
ü
Register Wireless Telephones
ü
Program Wireless Telephone Features
ü
Test Wireless Telephones
ü
Site Certification
ü