C. Crane A-66 PDAs & Smartphones User Manual


 
5900335 © 2005 JCM-American Corporation
5-2
INSTALLATION Optipay™ CC Section 5
6. Connect the Coin Changer to the Vending
Machine using the MDB connecting cable
(See Figure 5-1 [1]).
7. Reconnect the Vending Machine’s main AC
power supply. The three LEDs (See Figure 5-
1 [2]) located on the Coin Validator’s front
panel will briefly illuminate to test their
functions. Afterwards, the Green LED should
remain lit. The Coin Changer is now
operational and ready for use.
NOTE: A second Harness containing a four
pin connector is used with the optional
DBV-301 Validator’s RC-10 Recycling Unit.
This should be tied off if not being used.