C. Crane A-66 PDAs & Smartphones User Manual


 
5900335 © 2005 JCM-American Corporation
5-1
Optipay
CC
A-66 Coin Changer
Section 5
5 INSTALLATION
This section provides a installation instructions for
the Optipay™ CC A-66 Coin Changer.The A-66
Coin Changer is either:
Energized within a Vending Machine, or
Connected to a JCM Test Station using
WinMDB
©
software for test purposes or
Connected to one of the following JCM
configuration tools for set up purposes:
A PC programming station containing
WinEMP
©
software
A Palm Pilot
®
handheld (containing
installed PalmA66
®
and/or PalmEMP
®
software).
This section describes how to connect the Coin
Changer to a Vending Machine. For details on con-
necting the service tools, see section 11 "Config-
uration".
The following steps describe how to install the
Coin Changer into a Vending Machine:
1. Disconnect the Vending Machine’s main AC
power plug.
2. Unlock (See Figure 5-2 [1]), pull out [2] and
remove the Coin Validator from the Coin
Changer assembly by carefully lifting the left
and right side catches and gently pulling
forward as indicated by the arrows illustrated
in Figure 5-1.
3. Hang the A-66 in the Vending Machine using
the three mounting holes located on the back
wall of the Coin Validator. Two holes are
located at the top (See Figure 5-2 [3]) and
one is located at the bottom [4] (not shown).
4. Tightly secure the Coin Changer's housing to
the Vending Machine.
5. Replace the Coin Validator back into the Coin
Changer and engage.
To avoid damage to the equipment,
please make sure that you check the
following before installation:
– check that the Coin Changer’s MDB
connecting cable is suitable for the
Vending Machine interface.
– check that the Coin Changer’s power
supply is the same as the nominal
voltage stated on its product label.
Ensure that the Coin Validator assembly
remains safely connected to the Coin
Changer by the flat 40-wire ribbon cable.
Figure 5-1 Coin Validator Removal
Figure 5-2 Coin Changer mounting hole locations
3
Another hole
at bottom
Upper Mounting Holes
2
1
Pull
Out
Lift up
4
Ensure that an air space exists between
the Vending Machine’s return lever and
that of the Coin Changer when closing.