Linear VMC-1 Intercom System User Manual


 
9
Master Station Rough-In
VMC1MB Installation - Finished Wall
Cut out an opening in the drywall (Height 7-1/4” x Width 11”)
but do not cut right up against the wall stud. Allow 5/8”
clearance between drywall opening and stud. This ensures that
drywall will overlap bracket (See Figure 2). Slide the VMC1MB
vertically, then turn clockwise 90˚. Mount in place onto stud
using fasteners as shown. Hang Power Supply on VMC1MB
in the lower right corner as shown. It may be necessary to
lightly tap Power Supply in place onto VMC1MB fl ange with
a hammer.
Figure 2. Installing Bracket - Finished Wall
FRONT VIEW
FRONT VIEW
7-1/4”
FRONT VIEW
CUT OPENING
5/8” FROM STUD
STUD BEHIND
DRYWALL
DRYWALL
OVERLAPS
BRACKET
HANG POWER
SUPPLY ON VMC1MB
BRACKET AS SHOWN.
USE HAMMER TO LIGHTLY
TAP INTO PLACE ON MASTER
STATION BRACKET FLANGE
DRYWALL
STUD
DRYWALL
DRYWALL
DRYWALL
DRYWALL OPENING
IS 5/8” FROM STUD
CUT DRYWALL
OPENING
11”
SLIDE VMC1MB BRACKET
VERTICALLY INTO DRYWALL
OPENING
THEN TURN BRACKET 90°
CLOCKWISE AND MOUNT
TO STUD
TRACE THIS AREA
AS A TEMPLATE
FOR MASTER
STATION OPENING
ON DRYWALL
(7-1/4” x 11”)
VMC1MB