Lucent Technologies 308/616 IP Phone User Manual


 
Step 4 Wiring Runs
You may choose to wire your
SPIRIT
Communications System using 4-pair “business”
wiring materials or 2-pair “customer convenience” wiring materials. While the materials
are somewhat different, the procedure for labeling the wiring run is the same.
Each “run” from the controller to a telephone set location should be numbered and
labeled. Materials for labeling the telephone cords are included with the controller.
Do not skip this important step.
If you choose to use the 4-pair “business” wiring materials, the labeling should look
like the following:
Sample System Directory Label
Controller
10 11
12
13
Telephone Cord
Labels
D8W-87
Jumper
Cords
Jack Panel box
D4BU Telephone Cord
Jack Panel Wiring
Run Label
Modular
Connecting
Block
25’ Max.
Modjack/Modjack Adapters
Up to 1000’ length
of cable (8-conductor)
Wiring Run
Labels
If you choose to wire your system with customer convenience wiring, use the wiring run
labels to label
EACH END
of
EVERY
cord, as well as the wire junction boxes.
Note to installers: The SPIRIT system requires a reversal in the station set wiring. This reversal is in the
telephone (tinsel) cord that is packed with the telephone, so all other station set wiring should be straight.
6
Customer Installation Instructions