GDK-20W DIGITAL WIRELESS KEY TELEPHONE SYSTEM
58
Figure 3.6.18 Wall Mounting of Base Station (without wedge)
Before mounting base station permanently, you should determine locations that provide the best coverage. The wall
mounting procedure of a base station is as follows:
Drill two 3.5 mm holes in a fixed wall. To properly position the holes, you can measure the tags on the base station or
mark the surface through the tag eyelets while holding the base station in place.
Insert anchors into the drilled holes. Then insert screws in the anchors, leaving a 3 mm gap between the wall and screw
head.
Mount the base station eyelets on the screws.
Mounting Base Station - 2 (Using Wedge)
Installing the Base Station using the wedge,
Determine at first the location on wall where the wedge prepared for mounting the base station is to be fixed.
The wedge should be settled by using two screws on the wall.
And insert the base station pulling down into the wedge.
Figure 3.6.19 Wall Mounting of Base Station using Wedge