ADTRAN 604 Telephone User Manual


 
Total Access 600 Series System Manual Section 4 User Interface Guide
61200624L1-1B © 2004 ADTRAN, Inc. 99
L2 P
ROTOCOL
(TDM F
IRMWARE
) – T1 I
NTERFACE
> A
UTO
P
ROTOCOL
View the status of the T1 interface with the L2 P
ROTOCOL
set to A
UTO
(using Auto-config feature).
L2 PROTOCOL (TDM–T1–AUTO) > STATUS
View the status of the auto detect function and traffic flow for the T1 interface with an L2 P
ROTOCOL
set to
A
UTO
.
L2 PROTOCOL (TDM–T1–AUTO) > STATUS > STATE
This field represents the state of the auto detect/configuration function. The possible state are:
L2 PROTOCOL (TDM–T1–AUTO) > STATUS > TX PKTS
Number of packets transmitted out of the WAN port.
L2 PROTOCOL (TDM–T1–AUTO) > STATUS > RX PKTS
Number of packets received on WAN port.
L2 PROTOCOL (TDM–T1–AUTO) > STATUS > TX BYTES
Number of bytes transmitted out of the WAN port.
L2 PROTOCOL (TDM–T1–AUTO) > STATUS > RX BYTES
Number of bytes received out of the WAN port.
L2 PROTOCOL (TDM–T1–AUTO) > STATUS > CLEAR STATS
Clears all the gathered statistics for this interface and returns the counters to 0.
O
FF
The T1 interface is down, so the auto-detect/configuration process is
currently idle.
D
ETECTING
L2
P
ROTOCOL
The T1 interface is up and waiting for the first control/signaling packet.
C
ONFIRMING
FR
The T1 interface is up and one FR signaling packet has been received
C
ONFIRMED
FR
The T1 interface is up and two FR signaling packets have been received.
It takes two consecutive control/signaling packets of the same type to
confirm the detected protocol.
C
ONFIRMING
PPP
The T1 interface is up and one PPP control packet has been received.
C
ONFIRMED
PPP
The T1 interface is up and two PPP control packets have been received. It
takes two consecutive control/signaling packets of the same type to
confirm the detected protocol.