Symbol Technologies PDT 8000 Series PDAs & Smartphones User Manual


 
11-16
PDT 8000 Series Product Reference Guide
status screen will then appear. When complete, press the Enter button to return
to the main menu.
b. If you selected Auto Select in step 4, the terminal will automatically return to the
main menu once download is complete.
c. If you selected Monitor in step 4, the terminal will reboot once download is
complete.
11. When all partitions are downloaded successfully, hard reset the terminal by
removing the battery door and pressing the Power key and a Scan button,
simultaneously.
Begin the Send in TCM
In TCM on the host computer:
1. Select the script.
2. From the File menu, choose Load Terminal,
OR
On the toolbar, choose . The Load Terminal screen displays.
3. If the correct hex file is not displayed in the Hex File to Load field, click on the
Browse button and navigate to the correct hex file to be downloaded.
4. From the Comm Port drop-down menu, select the COM port being used. Ports
already in use display in the Unavailable Ports field.
5. From the Baud Rate drop-down menu, select the appropriate baud rate. Your
options are 2400, 4800, 9600, 19200,38400, 57600, 115200.
6. From the Protocol drop-down menu, select None.