Radio Shack ET-1125 Cordless Telephone User Manual


 
8
7. Lift the base’s antenna to a vertical
position.
Note:
To mount the phone directly on a
wall, you need two screws (not supplied)
with heads that fit into the keyhole slots
on the bottom of the base.
Follow the steps under “On a Wall Plate
or Wall” on Page 7, then apply these ad-
ditional instructions for placement on a
wall.
1. Drill two holes 3
15
/
16
inches (100 mm)
apart. Then thread
a screw into each
hole, letting the
heads extend about
3
/
16
inch (5 mm)
from the wall.
2. Plug one end of the supplied long
modular cord into the
TEL LINE
jack
on the back of the base and route
the adapter cable and modular
cords through the grooves on the
base.
3. Align the base’s keyhole slots with
the mounting screws and slide the
base downward to secure it.
CONNECTING AND
CHARGING THE BATTERY
PACK
The phone comes with a rechargeable
nickel-cadmium battery pack in the
handset. Before using your phone, you
must connect the battery pack, then
charge it for about 24 hours.
1. Press down and slide off the battery
pack compartment cover.
3
15
/
16
Inches
3
/
16
Inches