14 February 2005 IPD4-A2-GZ40-00
4. Pull the hook-and-loop fastener strap upward, making sure that it is snug
against the connector, then pull the strap back down, such that the
hook-and-loop fastener layers stick to one another across the top of the
connector.
5. Tuck the tab at the end of the strap down between the connector frames so
that it is out of the way of other connections.
6. Screw the right side of the RJ21 cable connector into the jack screw on the
right side of the RJ21 connector frame on the chassis. Note: If you are using a
120 or 180 degree cable, both the right and left sides of the cable connector
should be screwed to the RJ21 connector frame on the chassis.
The LK (Link) LED for each port being connected with a remote modem will
illuminate solid or flashing green to indicate a connection has been established.
Link up time between interface modules and remote modems can vary from one to
five minutes depending on the quality, gauge and distance of the copper cable
pair(s) being used. Refer to individual interface module user guides for specific
information such as connector pinouts, parameter configurations and distance
capabilities.