Alcatel Carrier Internetworking Solutions Conference Phone Conference Phone User Manual


 
28
2. INSTALLATION
Base Pod
l Place the base and Pod units on a flat, stable surface.
2.1 INSTALLING THE BASE
2.1.1 Connecting the base
l Plug the base power supply cable into the socket at the back of the base.
l Connect the mains adapter to a 230 V / 50 Hz electrical socket.
"
The red power indicator on the base should light up.
l Plug one end of the phone cable into the socket at the back of the base, and the other into the phone line socket.
2.1.2 Wall mounting (optional)
To wall-mount the base, follow this procedure:
l Make sure that the base unit is not too far from a power socket and that you do not drill through any electrical wiring concealed in
the wall.
l Drill three holes using the template provided on page 143 of this guide.
l Insert three screws (not supplied) into the holes. Leave the screw heads approximately 3 mm proud of the wall.
l Slide the base unit down over the screw heads.
Versatis_Conference_uk.qxd 31/03/2005 16:03 Page 28