Installation Considerations
4
10. A breaker coordination study should be performed to ensure proper handling of fault currents.
Figure 1 Multi-Module 500 to 750kVA UPS
Figure 2 UPS Multi-Module Unit block diagram
NOTE
The instantaneous trip setting of the breaker feeding the SCC bypass input should be high
enough to accommodate short-duration overloads. The bypass static switch inside the SCC can
draw up to 10 times the system’s rated current for up to three cycles.
UPS MODULE