NetSure™ ITM with eSure™ Technology
Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Spec. No: 582145500
32
Section 6040
Model: NetSure™ ITM Issue AB, April 8, 2013
Figure 19 EPO Jumper Location
4.4.8 Battery Connections
Batteries are factory installed and connected. Final connections to the batteries are made in the
procedure presented in 6.2 - Final Battery Connections.
4.5 Making Module-to-Module -48VDC and Ground/Return Interconnections
(if system consists of multiple DC UPS modules)
Note that all hardware is provided.
4.5.1 -48Vdc and Ground/Return Busbar Interconnects
1. Install the provided -48Vdc Interconnect Busbar(s) between the -48Vdc busbars located in each
adjacent DC UPS module. Refer to Figure 20 (DC UPS module with bottom feed DC distribution)
and Figure 21 (DC UPS module with top feed DC distribution). Torque to the values listed in the
illustrations.
2. Install the provided Ground/Return Interconnect Busbar(s) between the ground/return busbars
located in each adjacent DC UPS module. Refer to Figure 20 (DC UPS module with bottom feed
DC distribution) and Figure 21 (DC UPS module with top feed DC distribution). Torque to the
values listed in the illustrations.
DETAIL A
Components Behind Cover
EPO Fuse
EPO
Terminal
Block
EPO
Jumper
SUITA BLE F OR M OUNT ING ON CONCRE TE
OR O THER NON-CO MBUS TIB LE SURF ACE ONLY.
12
1 11
22
Front View
(door removed)
SEE DETAIL A
Top DC Distribution Feed Shown,
Bottom DC Distribution Feed Similar