6 Dell PowerApp 100 Appliances Rack Installation Guide
Figure 4. Two-Post Flush-Mount Rack Kit Contents
Recommended Tools and Supplies
You need the following tools and supplies to install the system in a two-post open-
frame relay rack:
• #2 Phillips screwdriver
• Masking tape or a felt-tip pen, for use in marking the mounting holes to be used
Marking the Rack
1. Determine where you want to place the bottom of the PowerApp 100 system.
CAUTION: If you are installing more than one PowerApp 100 system, install
the first system in the lowest available position in the rack.
flush-mount brackets (2)
10-24 x 0.25 inch flat-
head Phillips screws (4)
1-U template
inner mounting rails (2)
12-24 x 0.5-inch pan-
head Phillips screws (4)