Nortel Networks MICS-XC Telephone User Manual


 
Installation / 31
P0881594 Issue 01 MICS-XC Norstar-Companion Installer Guide
Installing Base Stations
Before installing wireless equipment, ensure that a site planner
has determined Base Station locations and recorded them in
the Provisioning Record.
41
OBIX14
BS14
-PWR Yellow-Blue
16 Blue-Yellow
42 TCM Yellow-Orange
17 Orange-Yellow
43 +PWR Yellow-Green
18 Green-Yellow
44
OBIX15
BS15
-PWR Yellow-Brown
19 Brown-Yellow
45 TCM Yellow-Slate
20 Slate-Yellow
46 +PWR Violet-Blue
21 Blue-Violet
47
OBIX16
BS16
-PWR Violet-Orange
22 Orange-Violet
48 TCM Violet-Green
23 Green-Violet
49 +PWR Violet-Brown
24 Brown-Violet
50
25
Each Base Station must be installed within 1230 m
(4000 ft., TCM wiring length) of the ICS or Base
Station Module.
To optimize seamless hand-off, the difference in TCM
wiring length between neighboring Base Stations
should not exceed 300 m (1,000 ft.).
Pin RPI Connector Board Label Wire color
p0881594.book Page 31 Tuesday, August 25, 1998 3:59 PM